Open Pit Long Term Mine Planning and Design Using GEOVIA Surpac
Course Overview
Open Pit Long Term Mine Planning & Design Using GEOVIA Surpac
Learning Materials & Syllabus
Syllabus:
- Strategic Long-Term Mine Planning Overview
- Introduction to GEOVIA Surpac
- Geological and Block Model Integration
- Open Pit Design (Pit, Bench, Berm, and Ramp)
- Mining Infras (Waste Dump, Stockpile)
- Haul Road Design
- etc
Training Schedules
| BATCH | DATE RANGE | STATUS |
|---|---|---|
| Batch #1 | 18 Aug - 21 Aug 2026 | Completed |
| Batch #2 | 22 Aug - 25 Aug 2026 | Completed |
| Batch #3 | 22 Sep - 25 Sep 2026 | Available |